|
|
| |
|
|
|
|

|

|
Click to enlarge image
|
Model Number |
DG1 |
Geared Trolleys ranges from 1ton to 10ton
Model : DG1, DG2, DG3, DG5
Trolley is packaged disassembled as follows:
- Two(2) side plate assemblies;
- One(1) center suspension plate; and
One(1) trolley pin that includes one(1) fixing bolt, sixteen(16) adjusting washers, two(2) rings, one(1) side washer, and one (1) locknut.
1. Please adjust the beam width by adjusting the washer according to the following table.
Assemble the trolley pin(T08) to the bracket(T07) on one of the trolley side plate assemblies.
Fasten the trolley to the bracket using fixing bolt(T13).
2. Position adjusting washers(T14), rings(T15), and center suspension plate(T09) on trolley pin
for beam flange width as shown in the Table. Based on trolley capacity and beam flange width,
position adjusting washers as per figures A thru I.
3. Position other side plate assembly on trolley pin. Position any remaining adjusting washers
(T14) and side washer(T12) on trolley pin. Tighten locknut(T11) against side washer(T12) on
trolley pin.
Center suspension plate(T09) must be positioned in center of side plate assemblies and
directly under the center of the beam. Recommended clearance toe of beam and wheel flange is
1/16 inch. Maximum clearance should not exceed 1/8 inch.
|
|
|
|
| |
|
|
|